Cone crusher maintenance system

    11.1 Regular inspection and maintenance

    Serial number

    Part

    content

    standard

    cycle

    Responsible for the job

    1

    Lubricate hydraulic lines and water seal dustproof devices

    1. Pressure gauge oil flow and water flow and oil temperature

    2. Cleaning oil and water pipelines to check oil pumps and valves and cylinders

    3. Check the cleaning water seal device and dust ring

    1. Normal indication, normal temperature

    2. The pipeline is unblocked and the leaks are not working properly.

    3. No leakage, no dust

    Every shift

    30 to 45 days

    30 to 45 days

    Operator

    fitter

    fitter

    2

    Body and spring part

    1. Various screws

    2. Various funnels

    3. Spring and spring screws

    1. Fit properly

    2. Patching

    3. Fastened, balanced, without break

    Every shift

    30 to 45 days

    Every shift, 3 months to 1 year

    Operator

    fitter

    Operator

    fitter

    3

    Broken part

    1. Compression nut tightening

    2. Broken wall fastening

    3. Moving cone part inspection

    4. Check the tightness of the spherical bearing and the contact level of the contact surface

    5. Check the matching clearance of each part

    6. Rolling wall and fastening device

    1. Fastened without looseness

    2. No zinc and loose

    3. The lower spherical surface is well fitted and the oil groove is unblocked.

    4. Fastening, good contact, proper scraping, strengthening and sealing

    5. The gaps in each department meet the standard

    6. Replace the rolling wall or fasten

    Every shift

    30 to 45 days

    30 to 45 days

    30 to 45 days

    30 to 45 days

    Operator

    Operator

    fitter

    fitter

    fitter

    fitter

    4

    Drive shaft section

    Transmission gear

    2. Transmission shaft bearing condition check

    1. Meet the specified meshing clearance

    2. Adjust to the specified clearance

    30 to 45 days

    30 days

    fitter

    fitter

    5

    Electrical part

    Motor temperature rise

    2. Motor bearing

    3. Short circuit ring and oil switch

    4. All high and low voltage electrical systems

    1. Not more than 60 ° C

    2. Moderate clearance

    3. Sensitive and reliable

    4. Cleaning is sensitive and reliable

    Every shift

    One year

    30 to 45 days

    6 months

    Operator

    Electric fitter

    electrician

    electrician

    11.2 Regular lubrication

    Serial number

    Lubricating part

    Lubrication method

    Type of lubricant

    Lubrication cycle

    Be responsible for

    Work type

    Come on

    Change oil

    1

    Vertical shaft, eccentric bushing, bevel gear, spherical bearing, drive shaft bearing

    Pressure cycle oil pressure 0.7~1.5kg/cm 2

    45 #油油粘度

    F50=5.24~7.07

    The oil reaches the oil mark

    Change once every season

    Operator

    2

    Motor bearing

    Pressure pump

    Calcium sodium grease

    Drop point T=120°C

    Oil injection once a month

    Change oil every six months

    Electric fitter

    11.3 Regular cleaning

    Serial number

    Cleaning site

    Cleaning requirements

    cycle

    Responsible for the job

    1

    Lubrication system

    External lubrication of all lubrication systems after parking

    Every shift

    Operator

    2

    Various parts of the body

    1. After parking, clean the surface of the machine

    2. Keep the machine clean

    3. External cleaning of electrical and electronic facilities

    Every shift

    Operator

    3

    Other ministries

    1. Waste oil rags are placed in a certain place

    2. Sprinkle water around the machine (be careful not to spill on electrical equipment)

    3. Clean up the discharged waste oil and do not flow to the cement foundation.

    4. The hydraulic system is prohibited from entering or entering dust to prevent oil emulsification or pressure drop.

    Every shift

    Operator

    PSA Nitrogen Generator

    Psa Nitrogen Generator,Psa Nitrogen Making Machines,Cryogenic Liquid Nitrogen Plants,Psa Nitrogen Making Machine

    Jiangsu Minnuo Group Co.,Ltd , https://www.mingngroupcn.com

    Previous Post: Wastewater Treatment Mechanical Fine Bar Screen
    Next Post: ·The third phase of Tongchuan Shaanxi Auto Parts Processing Base was accelerated
    Home
    Recent Posts
    • HOWO Starter Sinotruk HOWO Spare Parts Motor (VG…
    • QC11y Series Hydraulic Guillotine Shear Machine
    • Emulsified Dirty Turbine Oil Processing Machine …
    • High Performance Carburetor Spray Cleaner
    • Aeropak Multipurpose Silicone Oil Spray
    • One Bag Woodworking Vacuum Cleaner
    • Teledyne TSS launches new gyro compass
    • Jasu Ls-40s Twin Spindle and Twin Turret CNC Lat…
    • High Active Formula Cockpit Shine (Auto Silicone…
    • How to choose a video surveillance camera
    • Three operating systems of constant temperature …
    • Stainless Steel Utensil PVD Gold Plating Machine…
    • What aspects have been optimized for LED portabl…
    • Epoxy Coating Cast Iron Luge Type Butterfly Valv…
    • Modified potassium ferrate can be produced indus…
    • Wholesale Steel Platform Hand Trolley Wheelbarro…
    • The two groups of companies have achieved remark…
    • SBS market demand cooling to expand more than
    • Henan University and Jinchuan Group jointly brea…
    • Hydraulic Sand Sucker Gravel Slurry Pump