Ji'an Hedong Binjiang New Area Road Network Demolition and Resettlement Project

    Project name: Road network relocation and resettlement housing project in Hedong Binjiang New District, Ji’an City Progress of construction phase: Construction preparation Construction period: 2011-2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, lighting facilities, cranes .
    Project Introduction:
    The project is located at the southeast corner of the intersection of Heqi Road and Jinggang Road in Hedong Binjiang New Area, Ji’an City, Jiangxi Province. It is the Tianli Garden Residential Quarter in the east and has a total construction area of ​​75,000 square meters. The project is divided into 2 bid sections: I Lot: Total Construction Area of ​​about 34103 square meters, including: 1#~3# storefronts: frame/second floor, building area 772 square meters; 1#~3# basement: one floor, building area 6443 square meters; 1# building: frame/16 Floor, building area 9677 square meters; 2# building: frame/26 floors, building area 12189 square meters; 3# building: frame/eleven floors, building area 4724 square meters; 3#~4# storefront: frame/ Second floor, construction area of ​​308 square meters. : II Lot: The total construction area is about 40,984 square meters, among which: 4# building: frame/eleven floors, construction area 4724 square meters; 5# building: frame/eleven floors, building area 5706 square meters; 6# building : Frame/22 floors, construction area 9739 square meters; 7# building: frame/25 floors, building area 11056 square meters; 3, 4# storefronts: frame/second floor, building area 308 square meters; 4~ 7# basement: one floor, building area of ​​8,475 square meters; 4, 5# storefront: frame/second floor, building area of ​​976 square meters.

    The total investment of the project: 99 million yuan, source of funds: funding from superiors.

    Construction Unit: Ji'an Qingyuan District Urban Investment Development Co., Ltd. Postal address: 4th Floor, Construction Bureau, Qingyuan District, Ji’an, Jiangxi Province Post Code: 343009
    Contact: Liu Ying Telephone Fax

    Related Developments: Tower Crane Infrastructure Project

    35mm Alloy Tube

    35Mm Alloy Tube,Thick Walled Seamless Alloy Steel Pipe,Seamless Carbon Steel API Pipe,Cold Rolled Alloy Steel Pipe

    Tianjin Gongjiantiangang Steel Pipe Co., Ltd. , https://www.gjalloytube.com

    Previous Post: Bearing output value is expected to increase by 11% year-on-year to 158 billion yuan this year
    Next Post: Volatile commercial vehicle business frustrated to establish joint ventures in China
    Home
    Recent Posts
    • Gear occlusion touch non-linear profiling simula…
    • Fans are used in greenhouse ventilation in south…
    • Lighting companies join the trend of online sale…
    • Can buy National Day train ticket from now on
    • China's high-end CNC machine tools must brea…
    • FMC receives $90 million in supply contract
    • New energy vehicles subsidize new government pol…
    • Carefully car in autumn and fall
    • Volvo car is called BMW, Mercedes, aiming to get…
    • 10 Inch Heavy Duty Pneumatic Tyre Fixed Wheel
    • The proportion of powder metallurgy auto parts i…
    • China's economic decline or delays the recov…
    • Australia cancels anti-dumping investigation aga…
    • In 2016, Xinjiang built 3,058 fruit and vegetabl…
    • Lab Glassware Distilling Flask, Boro 3.3
    • The best way to transport food in a refrigerated…
    • Forecast the future development trend of China&#…
    • Online shopping or new car sales point
    • Changzhou Jinling Drying Co., Ltd. Introduces Ru…
    • Test of sugar content and climate change of suga…