Suction trucks should not be too full

    Suction trucks are mainly used in some urban and rural sanitation departments, for the purpose of public facilities, the suction of underground pipe networks, the transport of manure, or the transportation of other sewage, etc., and also the extensive use of animal manure suction and transportation at some farms. Wait. The vehicle is mainly relying on a vacuum pump to pump out the air in the honeypot so that it can form a negative pressure. The atmospheric pressure outside the tank is used to push the dirt through the suction tank and push it into the tank. The operation is the opposite of a sewage job.

    When using a vacuum pump to suck manure, the suction truck must use the correct operation method. It must not be performed after the suction truck has been filled with tanks. This will not only cause the suction pump to cause Damage, in addition, will cause a certain degree of damage to the engine of the vehicle. Although the suction truck is equipped with a spill-prevention valve, the main feature of the spill-prevention valve is to prevent the suction truck from overflowing into the vacuum pump after it has been filled. It is not a million-year-old part and it is because of the outside world. The influence of the factors led to the failure of the spill control valve. Those who have filled the suction truck tank and are still pumping it, will directly make the ball of the spill-proof valve get stuck in the impurities in the sewage, or the float ball will be biased. At this time, the suction truck In which gap the dirt in the tank will permeate out. If there is too much inhalation of impurities, the oil pipe mouth will be blocked. At the same time, the oil inside the oil separator will not be able to be given to the vacuum pump again. The supply of lubrication, after a long time, the vacuum pump will burn, hot conditions. If the vehicle tank is already full, the suction pump still continues to pump but there is no more air to pump. At this time, the vehicle generator will be overloaded and cause the engine to stall. In severe cases it will lead to damage. of.

    Therefore, the driver's friend of the suction truck cannot think of relying on the anti-overflow valve to understand whether the suction truck is full or not. It should be after a certain period of time. The tank is full, and this method is the most accurate and safe method. (Text / Sun Ni)


    High performance customizable aluminum plate&bar charge Air Cooler for truck

    Advantage of Truck Coolers (Aluminum Water Coolers):


    1)Professional design

    2)Customize the heat exchangers upon customers` requirement
    3
    )Compact, Lightweight, High Efficient Heat Transfer

    4)Rapid response to your needs


    Customize coolers upon your drawing or sample or technical parameters .

    Aluminum Plate&bar Construction


    Aluminum Core : High strength, high heat conductivity,high safety coefficient.
    Supersonic Cleaning: High efficiency,little corrosion to metal , few pollution.
    Vacuum Brazing : Strict control of vacuum degree, temperature and time.
    Argon Welding : Weld Gaps straight appearance , squamous uniform.

    Test : Air tightessn test

    FAQ

    Q1:Could you customize oil cooler/Heat Exchanger?

    We can customize heat exchanger/oil cooler /intercooler according to your drawings or samples.

    Plate-fin (plate&bar) coolers usually don't need mould tooling fee.

    For tube&fin intercoolers, stacked Oil Coolers , if what you need aren't our existing products, it need mould tooling fee.

    Q2: I want to buy your products, how can I pay?

    A :You can pay via T/T

    Q3: How can you guarantee the quality?

    A: One year's warranty against B/L date.

    Q4: If we don`t find what we want on your website, what should we do?

    A: You can email us the descriptions and pictures of the products you need, We will check whether we can make it.

    Q5: Can we buy samples for quality testing?

    A: Yes, we understand quality test is important and we are glad to send the sample for quality testing.

    Q6: What is the lead time?

    A: Normal : Plate-fin heat exchanger for 2~3 weeks; Tube&fin or stacked layer coolers for 5 weeks. Exact time upon negotiation .



    Truck Aluminum Coolers

    Truck Charge Air Coolers,Heavy Truck Heat Exchanger,Truck Coolers,Aluminum Water Coolers

    Wuxi Better Technology Co., Ltd , https://www.btheatexchanger.com

    Previous Post: Understand the model is not 忽悠 cloud engine model interpretation
    Next Post: Failure Analysis of Laser Welding and Friction Welding of Power Battery
    Home
    Recent Posts
    • Attention Problems in the Transportation Process…
    • Centrifugal pump energy loss and efficiency
    • · China-US Joint Commission on Commerce and Tra…
    • How about the market price of small blasting equ…
    • Highway law enforcement vehicles need to perform…
    • What are the characteristics of a good 4m3 refri…
    • "ID card" carry cold chain car is &quo…
    • Second hand sprinkler pump can not suck water ho…
    • Fire hazards in laying wires and cables in power…
    • See the car crane to show their talents
    • Main Category of Greening Sprayer
    • The latest study of the SGX: When the dry market…
    • Snow driving cockpit has a coup
    • Mercedes-Benz Viano's Humanized Facilities
    • Comprehensive analysis of Mercedes-Benz deterren…
    • Save the world car
    • Water and fertilizer integration technology deve…
    • The conservation knowledge of using a pointed gr…
    • What are the types of garbage trucks?
    • China's 4.2-meter refrigerator car price adv…