Technique: Forged
Type: Tube Adapter
Head Code: Hexagon
OD Size: 1/16′′-1′′
Structure: Straight/Elbow/Tee/Cross
Working Pressure: Up to 6000psi
Medium: Water, Oil, Gas
Working Temperature: -20 to 200 Celsius Degree
Power: Hydraulic
Trademark: YC-LOK
Transport Package: Wooden Box
Specification: 38*27*17cm
Origin: Jiangsu, China (Mainland)
HS Code: 7307290000
1.Product Name:
Brass NPT Male Tube Adapter Compression Fittings Pipe Fittings
2.Description:
Material: Stainless Steel / Carbon Steel / BrassTechnique: Forged
Type: Tube Adapter
Place of Origin: Jiangsu, China (Mainland)
Brand Name: YC-LOK
Connection: Thread
Shape: Equal
Head Code: Hexagon
OD Size: 1/16''-1'', 3mm-25mm
Structure: Union, Elbow, Tee, Cross, Bulkhead, Male or Female Connector
Working Pressure: Up to 6000psi
Medium: Water, Oil, Gas, Acid, Base and More
Special Treatment: Ferrule Hardness Treatment
Nut Treatment: Silver Plated
Tube Treatment: Fully Annealed
Inner Cone: Mirror Polishing Processing
Working Temperature: -20 to 200 Celsius Degree
Power: Hydraulic
3. Packaging & Delivery
1.Packaging Details: |
1. Wooden box 2. Carton 3. As your request. |
2.Delivery Detail: | Shipped in 30 days after payment |
3.Logo: | Any logo is available |
4.MOQ: | 100 pcs |
5.Samples: | Free |
6.OEM Accepted | Yes |
7.Production Capacity: | 10,000pcs Per Week |
8.Payment Term: | (1) L/C, T/T, D/P, D/A, PAYPAL, WESTERN UNION, MONEY GRAM |





FAQ:
Q1. Can I get free samples?
A: Yes, we can provide you with free samples, but you need to bear the delivery costs.
Â
Q2. Can I have a sample order for fittings?
A: Yes, we welcome sample orders to test and check quality. Mixed samples are acceptable.
Q3. Are you a trading company or a manufacturer?
A: We are a manufacturer.
Q4. What is your payment term?
A: Normally T/T 50% in advance, balance to be paid before delivery.
 Q5: What is your main market?
A: North America, Greenland, South America, Africa, Southeast Asia, Former Soviet Republics, East Asia, and Europe.
 Q6: What kind of trade terms can you do?
A: EX-WORKS, FOB, CFR, CIF, etc.
Q7. What about the lead time?
A: Sample needs 15 days, mass production time needs 35 days.

SICHUAN TELOS NEW MATERIAL TECHNOLOGY CO., LTD , https://www.kenlarcutters.com